Overview

Deliver AI Services Faster with an Environment Built for Liquid‑Cooled Performance

OSK12 in Ibaraki City, Osaka Prefecture Nishiai delivers date‑certain capacity in 2028, giving you an 18MW first phase with a clear path to a planned 36MW across a two‑building campus. Engineered for high‑density, liquid‑cooled AI and HPC infrastructure, OSK12 provides stable, scalable power and operational consistency through our unified global platform. Build confidently on a site designed for modern workloads - while your teams stay focused on applications, models, and user experience. OSK12 brings predictable scale, resilient infrastructure, and an AI‑ready environment to one of Japan’s fastest‑growing digital markets.

Download the brochure

Request a quote

Specifications

Specifications

Icon denoting Power

Power

18MW of IT load, dual power substations through diversified paths.

Icon denoting Connectivity

Connectivity

Carrier-neutral and multiple local-carrier entry points from diversified paths.

Icon denoting Cooling

Cooling

N+1, wall-blown air-conditioning, air-cooled modular chiller and direct liquid cooling (DLC) available.

Icon indicating Security

Security

24x7 security operations center (SOC) and security patrol along with multifactor authentication access control.

Map of Osaka North 1 Data Center

Why Osaka

Osaka OSK12 Data Center is located approximately 35 minutes by car from central Osaka and about 30 minutes from Itami Airport. The site, situated in Ibaraki City, Osaka Prefecture, sits on flat land at an elevation of around 36 meters above sea level and is in an area that has a low risk of natural disasters.

Contact us

We’re here to help!

Speak with an expert about our data center solutions and discover how we can help drive your organization forward.